Strengthening Weak Ground for a Hotel
When it comes to building structures like hotels, the foundation is everything. But what happens when the ground is too weak to support the weight of the building? That’s where displacement piling comes in. We’re currently working on a project for a client who wants to build a hotel, but the ground conditions are less than ideal. The soil is weak, and traditional foundation methods just won’t cut it. So, we’re using a technique called displacement piling to improve the ground and create a stable base for the hotel.
The Challenge: Weak Ground
The site for the hotel is on soft, unstable soil. If we were to build directly on top of this ground, the hotel would likely settle unevenly over time, leading to structural issues. To avoid this, we need to improve the ground’s load-bearing capacity. That’s where displacement piling comes into play. This method allows us to strengthen the soil without having to remove large amounts of material, making it both efficient and environmentally friendly.
The Solution: Displacement Piling
Displacement piling is a ground improvement technique that involves using a displacement auger to push soil sideways, rather than removing it. This process compacts the surrounding soil, making it denser and more stable. Once the auger reaches the desired depth, we pump concrete into the cavity under pressure, creating a solid pile that will support the structure.
The Process: Step by Step
- Drilling Down: We start by driving the displacement auger into the ground. The auger has opposing flights—one at the bottom that drills into the soil and brings up some spoil, and another higher up that pushes the soil outward. This dual action displaces the soil, compacting it and creating a stable cavity.
- Reaching the Hard Layer: The auger is driven down to a depth of 16 meters, where it reaches a harder, more stable layer of soil. This is the point where we start pumping concrete.
- Pumping Concrete: As the auger is slowly pulled out of the ground, we pump concrete into the cavity under positive pressure. This ensures that the concrete fills the entire space, creating a solid, continuous pile.
- Completion: Once the auger is fully retracted, the concrete is allowed to set, forming a strong, durable pile. These piles will act as the foundation for the hotel, providing the necessary support to prevent settling or structural issues.
The Machinery: A Heavy-Duty Operation
The displacement auger we’re using is a massive piece of equipment. It’s 16 meters long, weighs 9.1 tons, and can push an additional 13.5 tons of force into the ground. When pulling out, it can handle up to 20 tons of bulk. The auger’s unique design, with opposing flights, allows it to displace the soil effectively, creating a stable cavity for the concrete.
Why Displacement Piling?
Displacement piling is an excellent choice for this project for several reasons:
- Ground Improvement: By compacting the soil, we’re increasing its load-bearing capacity, which is crucial for supporting the weight of the hotel.
- Efficiency: This method minimizes the amount of soil that needs to be removed, reducing waste and speeding up the construction process.
- Environmental Impact: Because we’re not removing large amounts of soil, the environmental impact is significantly reduced.
The Big Picture
For our client’s hotel project, displacement piling is the key to overcoming the challenge of weak ground. By improving the soil’s stability, we’re ensuring that the hotel will have a solid foundation that will stand the test of time. This method not only addresses the immediate issue of weak ground but also provides a long-term solution that will prevent future structural problems.
Building on weak ground is no small feat, but with techniques like displacement piling, it’s entirely possible to create a stable foundation for even the most ambitious projects. For our client’s hotel, this method is proving to be the perfect solution, allowing us to strengthen the ground and ensure the building’s longevity. So, the next time you see a hotel rising from what seems like unstable ground, you’ll know that there’s some serious engineering at work beneath the surface.
Follow Us
Do you have an extraordinary journey in mind? Let us help you in celebrating the triumphs, learning from the challenges, and embracing the power of collaborative design and construction. Together, let's create a better future.
If you liked this article, please like, follow or subscribe on your favourite platforms.

Award winning
Our unique engineering approach to construction management is built on strong analytical minds that say there’s ‘never a problem, always a solution’.
We have an ethos of building things that work. Added to this an exceptional back office team who offer a streamlined, process driven approach to project delivery. On time with industry leading quality.
Trust Keola
Award winning
Excellent track record
We take care of the details, expertly navigating the intricacies of working with Council for RMA issues, noise, fire rating, inter-tenancies, unit titles, parking, infrastructure etc.
Can-do approach
Sometimes it takes a little Kiwi ingenuity to figure out a cost-effective way of bringing an architect’s vision to life. So if you’re looking for a builder that’ll add value and finesse to your project, call us.
Exceptional experience
Director Sanjesh Lal is a Chartered Civil Engineer and Registered Master Builder. He’s backed by the exceptional and experienced Keola team to expertly manage your construction project.
Difficult site? No problem
Constructing a building with difficult site constraints? Rest easy. We take pride in our engineering approach to construction management on challenging sites.
Low Variations
Our approach and deep understanding of the process means we price very accurately and pride ourselves on low variations. That means you can trust the figures we put forward.
0
rooms built0
happy families0
sqm of floor space created